Read-only report. Updated live from the votes.
What is one change that would help us deliver better work, faster?
Project ended. Report generated October 5, 2026.
Everyone
60%
of 40 invited people took part. Typical is 30–50%.
24 people ranked 11 ideas in 767 votes
32votes per person
5days run time
A strong result. Most measures are above what past projects see.
60%Took part Above typical (30–50%)
100%Voted Above typical (55–90%)
46%Added an idea Above typical (10–30%)
50%Commented or saved Typical (20–50%)
What stands out
- 24 of 40 invited people took part (60%). Past projects typically see 30–50%.
Decisions and next steps
- Going ahead: Pick one priority per sprint and say no to everything that is not it. Owner: Jordan Lee, Head of Engineering. Next step: Draft the shared note template and trial it for two weeks. Due 2026-10-18.
- Going ahead: Give every project a named owner and a written definition of done before work starts. Owner: Sam Rivera, Product Manager. Next step: Write the list of low-risk changes and the automatic check, then review with the team. Due 2026-10-25.
- Decide later: Automate the manual test run that currently takes two days before each release. Next step: Revisit after the next planning cycle.
The top 10 ideas
Ranked by how often each idea was chosen in head-to-head comparisons. Ideas need at least 3 comparisons to appear.
- 1Pick one priority per sprint and say no to everything that is not it.Chosen 74% of the time in 115 comparisons.
- 2Give every project a named owner and a written definition of done before work starts.Chosen 71% of the time in 100 comparisons.
- 3Let any engineer approve small, low-risk changes without waiting for a manager.Chosen 68% of the time in 109 comparisons.
- 4Cut the weekly status meeting to 15 minutes and move updates into a shared written note.Chosen 62% of the time in 105 comparisons.
- 5Write a one-page release checklist so nothing depends on one person's memory.Chosen 60% of the time in 109 comparisons.
- 6Automate the manual test run that currently takes two days before each release.Chosen 59% of the time in 110 comparisons.
- 7Run a short demo at the end of each sprint so people see what shipped.Chosen 52% of the time in 101 comparisons.
- 8Set aside one afternoon a week with no meetings, for focused work.Chosen 47% of the time in 101 comparisons.
- 9Agree which decisions need a meeting and which can be made in writing.Chosen 42% of the time in 108 comparisons.
- 10Hold a short retrospective after every release and share what we will change.Chosen 39% of the time in 96 comparisons.
How to read this report
People saw two ideas at a time and chose the one they valued more. Ideas never show who wrote them to voters, and people never see their own ideas. Groups under 5 people are never reported separately. Names appear only where the author chose to be named. How voting works.